Installation method of zinc steel guardrail


Published:

2019-09-10

First of all, prepare tools: impact drill, tape measure, wrench water, leveling ruler engineering line or level gauge, first drill expansion wire hole to fix a column level gauge for straightening, measure the length of the mesh with a ruler, and then start to fix the second column. The spacing between the two columns should be greater than 1 cm of the mesh, so that it is easier to load the film. The assembled film can be directly installed, leveled and straightened

First of all, prepare tools: impact drill, tape measure, wrench water, leveling ruler engineering line or level gauge, first drill expansion wire hole to fix a column level gauge for straightening, measure the length of the mesh with a ruler, and then start to fix the second column. The spacing between the two columns should be greater than 1 cm of the mesh, so that it is easier to load the film. The assembled film can be directly installed, leveled and straightened

Bulk: first press the cross bar on the waterproof pad, then put the cross bar on, then wear the small vertical bar, adjust the level and straight, and so on

Anping Ruitie Transportation Facilities Co., Ltd. Technology 15373736568